BOOSTESS POWER · ENERGY STORAGE SOLUTION

Microgrid ESS Solution

Coordinate local generation and storage.

Explore this solution
Illustrative solar and diesel microgrid energy storage application
DESIGNED AROUND YOUR APPLICATION

Coordinate local generation and storage.

Combine battery storage with solar generation, diesel generation and site demand for the required operating mode.

Concept illustration of battery storage for a solar and diesel microgridAPPLICATION CONCEPT · ILLUSTRATION

Microgrid ESS Solution

A remote facility or farm with a weak electricity supply may combine solar generation, diesel generation and battery storage. BOOSTESS Power plans the storage configuration around the local resource, measured demand and installation environment.

The battery can absorb available solar energy and supply stored power through a coordinated dispatch strategy. A compatible solar–battery–diesel design can reduce reliance on generator operation, while the actual fuel and electricity cost outcome depends on site demand and equipment capability.

The design must establish the required grid-connected or islanded operating mode. Grid-forming capability, black start, transfer behaviour, protection and generator compatibility are verified for the selected configuration rather than assumed for every product.

Verify grid-forming operation, islanding, black start, transfer behaviour, protection and generator compatibility for the selected configuration.

Discuss your project ↗
APPLICATION REQUIREMENT

A system built around your operating requirement.

Use available solar

Plan charging around the solar resource and local demand profile.

Coordinate generation

Define generator control, minimum-load operation and battery reserve.

Design for the location

Review access, environment, maintenance and operating mode.

FROM REQUIREMENT TO OPERATION

A practical path to energy storage.

  1. 01

    Assess the site

    Review the load profile, tariff, solar yield and connection capacity.

  2. 02

    Define the strategy

    Specify the charge period, discharge duty and required reserve.

  3. 03

    Verify operation

    Check the selected configuration through commissioning and monitoring.

BOOSTESS PRODUCT RANGE

Find the right equipment for your project.

Select the product configuration around your site and operating requirement.

BOOSTESS POWER PROJECT REFERENCE

CASE STUDY

Project:
New Zealand Farming on&off-grid PV/DG | 400 kWh
Address:
New Zealand
Description:
This energy storage project, located in New Zealand, addresses the energy needs of a farm, with a focus on both off-grid and on-grid applications. The project integrates Air-Cooling Energy Cabinets 50kW/100kWh to provide a reliable power backup system and to optimize the integrat
MORE
New Zealand Farming on&off-grid PV/DG | 400 kWh
Project:
Myanmar DeeDoke Village Solar, Battery, and Diesel C&I ESS
Address:
Myanmar
Description:
On April 27, 2019, the BOOSTESS team visited our commercial project in DeeDoke Village, Myanmar, and donated a lot of supplies to the school there. As part of the first phase of the whole commercial project, we powered up more than 200 local families — around 600 people — with a
MORE
Myanmar DeeDoke Village Solar, Battery, and Diesel C&I ESS
Project:
Nigerian Dairy Farm Microgrid | 241kWh
Address:
Nigeria
Description:
Located on the outskirts of Lagos, Nigeria, this dairy farm relies on continuous power for milking systems, refrigeration, and cold storage to keep fresh milk safe and ready for distribution. Due to unstable grid access and frequent blackouts, the farm had long depended on diesel
MORE
Nigerian Dairy Farm Microgrid | 241kWh — project illustration
Project illustration
Project:
Nigeria farms solar battery diesel hybrid systems 1.5 MWh
Address:
Nigeria
Description:
There are nine small villages in Nigeria where people previously lived without electricity and couldn’t afford it. However, everything changed when BOOSTESS arrived.
MORE
Nigeria farms solar battery diesel hybrid systems 1.5 MWh
Project:
Argentinian Vineyard Irrigation PV + ESS Project | 50kW/100 kWh * 4 Units
Address:
Argentina
Description:
Argentina’s Mendoza wine region is dry and increasingly exposed to longer droughts and higher electricity prices, while irrigation is absolutely critical to maintain grape yield and wine quality.​
MORE
Argentinian Vineyard Irrigation PV + ESS Project | 50kW/100 kWh * 4 Units — project illustration
Project illustration
Project:
Kenya Tea Factory PV + Diesel Replacement | 261kWh
Address:
Kenya
Description:
Kericho, located in Kenya’s renowned tea-producing region, is home to a large tea processing facility. The plant relies heavily on diesel generators to power its energy-intensive withering and drying machines, crucial steps in tea production. However, the high cost and environmen
MORE
Kenya Tea Factory PV + Diesel Replacement | 261kWh — project illustration
Project illustration
Project:
Czech Historic Castle Hotel | Microgrid 105/241 kWh
Address:
Czech Republic
Description:
Český Krumlov is a UNESCO World Heritage town with strict preservation rules that restrict visible rooftop solar and any changes to the historic skyline.​
MORE
Czech Historic Castle Hotel | Microgrid 105/241 kWh — project illustration
Project illustration
Project:
Rwanda, Kigali Crop Farm C&I PV ESS Solution | 482kWh
Address:
Rwanda
Description:
In recent years, the rainfall pattern in Rwanda has become increasingly unstable. Farmers are increasingly relying on pumping irrigation to ensure the yield of food and cash crops. Traditional diesel pumps not only have high operating costs but also bring significant carbon emiss
MORE
Rwanda, Kigali Crop Farm C&I PV ESS Solution | 482kWh — project illustration
Project illustration
Project:
Australian Gold Mine Off-Grid Power | 5MWh
Address:
Australia
Description:
Project Title:  Solar-Battery-Diesel Hybrid Power Plant for Diesel Replacement at WA Gold Mine
MORE
Australian Gold Mine Off-Grid Power | 5MWh — project illustration
Project illustration
Project:
PT Mitrabara Adiperdana Off-Grid System PV + Storage + Genset | 2.17 MWh
Address:
Indonesia
Description:
Located in one of Indonesia’s most remote regions, the Manilau site of PT Mitrabara Adiperdana Tbk — a leading coal mining company — has successfully transitioned from diesel dependency to clean hybrid energy. With collaboration from the TML team, BOOSTESS delivered a 20ft contai
MORE
PT Mitrabara Adiperdana Off-Grid System PV + Storage + Genset | 2.17 MWh
Project:
South African Mining Critical Backup + Diesel Gensets | 2.17MWh
Address:
South Africa
Description:
In the local area, the public grid is subject to frequent voltage and frequency fluctuations, with unplanned outages occurring several times per month and electricity tariffs in peak periods often exceeding typical off-peak prices by 30–50%, which significantly increases the mine
MORE
South African Mining Critical Backup + Diesel Gensets | 2.17MWh — project illustration
Project illustration
Project:
Accra Shopping Mall BESS Solution Microgrid | 3MWh
Address:
Ghana
Description:
In 2019, one of BOOSTESS’s partners in Ghana won a tender for a 1.5MWh off-grid project for a shopping mall in Accra. Before this, a BESS solution for a local hospital had been successfully delivered, demonstrating the benefits of battery energy storage and encouraging more entre
MORE
Accra Shopping Mall BESS Solution Microgrid | 3MWh
Project:
WA Australia Village Solar Battery Storage System | Centralized Backup Power | 1.5MWh
Address:
Australia
Description:
Community microgrid
MORE
WA Australia Village Solar Battery Storage System | Centralized Backup Power | 1.5MWh
1 / 13
PROJECT FAQ

Plan your application.

Can every BOOSTESS system operate off grid?

Off-grid operation requires compatible conversion equipment, control, protection and a confirmed operating design. Verify the selected configuration for the site.

How much diesel can the microgrid save?

There is no universal percentage. Calculate generator runtime and fuel use from measured demand, solar yield, battery efficiency and the proposed dispatch strategy.

What should I provide for a project assessment?

Share your location, load profile, tariff, solar yield, connection capacity and backup requirement. Our team reviews this information before selecting a configuration.

START WITH YOUR SITE

Let’s plan your energy storage.

Tell us about your application, local generation and operating requirement.

Contact BOOSTESS Power ↗
LET’S TALK ENERGY STORAGE

Contact Us

Tell us about your project.
Let’s explore the right energy storage solution together.

info@boostesspower.comWhatsApp +86 1360 6543 596
BOOSTESS air-cooled energy storage cabinetBOOSTESS 125kW / 261kWh split energy storage system
COMMERCIAL · INDUSTRIAL · UTILITY
blog-contact-Form
Need Help?
Scroll to Top