Define the battery role
Separate energy management from critical power quality and continuity.
Energy storage within a resilience strategy.
Explore this solution
Assess storage alongside the UPS, standby generator and electrical architecture of your data center.
APPLICATION CONCEPT · ILLUSTRATIONA data center requires an electrical architecture that reflects its availability target, critical-load profile and operating procedure. BOOSTESS Power assesses battery storage as part of that architecture, with a defined interface to the UPS, standby generation, switchgear and site control.
Subject to the approved design, storage can support renewable energy integration and tariff scheduling. The control strategy must preserve the required reserve before releasing energy for another duty, with transition behaviour and protection coordination verified by the engineering team.
Battery power, usable energy and autonomy are selected against the documented requirement. A general BESS does not inherently replace a certified UPS or guarantee uninterrupted transfer; continuity, maintenance responsibility and acceptance testing must be defined for the project.
A general BESS does not inherently replace a certified UPS or guarantee uninterrupted transfer. The qualified engineering team must verify the continuity requirement.
Discuss your project ↗Separate energy management from critical power quality and continuity.
Set the reserve before scheduling another battery duty.
Review the UPS, generator, switching, protection and EMS scope.
Review the load profile, tariff, solar yield and connection capacity.
Specify the charge period, discharge duty and required reserve.
Check the selected configuration through commissioning and monitoring.
Select the product configuration around your site and operating requirement.
Liquid cooling
MORE

A case study for this application is not yet available. Contact BOOSTESS Power to discuss your requirement.
Discuss your project
There is no automatic substitution. UPS power quality and transfer continuity require a specific engineering assessment.
Only where the approved control strategy maintains the required reserve and availability target. The resilience requirement takes precedence.
Share your location, load profile, tariff, solar yield, connection capacity and backup requirement. Our team reviews this information before selecting a configuration.
Tell us about your application, local generation and operating requirement.
Tell us about your project.
Let’s explore the right energy storage solution together.