Project Title:
Demand Charge Management for Auto Parts Plant

Capacity:
261 kWh

Application:
Peak Shaving + Load Shifting

Location:
Łódź, Poland

Project Background & Challenges:
Located in Łódź, a major industrial hub in Poland, this automotive parts manufacturing plant operates multiple energy-intensive stamping lines. Frequent production peaks often coincide with the local utility’s highest tariff windows, driving up operational costs through substantial demand charges. Electricity prices in the region can fluctuate sharply between off-peak (€0.12/kWh) and peak (€0.28/kWh) rates, significantly impacting the plant’s bottom line. Facing pressure to improve cost efficiency and sustainability, the plant sought an effective strategy to better manage its energy profile.

Solution & Value Delivered:
The facility implemented an advanced demand-side energy solution with an Energy Cube rated at 125kW/261kWh. This system strategically charges during low-tariff hours and discharges during peak periods, powering the high-load stamping lines and reducing dependency on expensive grid power. As a result, the plant successfully cut peak grid demand by 35%, substantially lowering monthly electricity bills. The project also achieved an attractive payback period of under four years, enhancing the plant’s financial resilience. Additionally, by flattening its load curve, the facility minimizes strain on the local grid, indirectly supporting broader energy stability and paving the way for future integration of renewable sources.

Planning a Similar Factory BESS Project?

Explore the 125kW/261kWh liquid-cooled Energy Cube and our factory energy storage solutions.

Share your project country, peak load, electricity tariff, existing PV capacity and target installation date in the form below. Let us know whether your priority is peak shaving, solar self-consumption or backup power. Results depend on the site load profile, tariff and system configuration.

Request a Factory BESS Assessment

← Back to case study
Share this projectLinkedIn ↗
Need Help?
Scroll to Top