Location:Nigeria
Application: Industrial Group Industrial and Commercial Energy Storage Project
Energy storage: 300kW/645kWh
Purpose: PV Self Consumption and Back up Power
1. Project Background
Nigeria, like many African countries, faces significant challenges in providing reliable, uninterrupted power to its commercial and industrial sectors. Frequent grid disruptions and soaring fuel costs make it difficult for hotels and industrial groups to maintain continuous operations. For hotels, inconsistent power supply can negatively impact guest satisfaction, damage equipment, and increase operational costs due to reliance on costly diesel generators. These pain points make energy security and cost efficiency top priorities for commercial facilities in Nigeria, where the need for stable, clean, and affordable energy is urgent.
2. BOOSTESS Solution Configuration and Its Benefits
The BOOSTESS solution deployed at this Nigerian commercial hotel consists of a 300kW/645kWh energy storage system configured with Energy Cube 105kW/241kWh units, seamlessly integrated with the site’s photovoltaic (PV) solar array. This system is designed for both PV self-consumption and critical backup power. Key features of the BOOSTESS configuration include:
- Real-time energy management to maximize solar utilization and minimize grid dependence
- Immediate backup activation during grid outages, ensuring uninterrupted hotel operations
- Stabilization of voltage and power quality for sensitive hotel equipment and guest amenities
- Modular and scalable, allowing for expansion as demand grows
The system leverages cutting-edge air cooling batteries cell 314Ah with long cycle life (>6000 cycles), integrated safety and fire protection, and automated power switching to provide high reliability and low operational noise.
105kW/241kWh Battery Project Highlights:
Single cabinet specifications: 105kW / 241kWh, total capacity of 645kWh
Maximal Scalability: Supports up to 12 cabinets in parallel, with AC side power coverage from 105kW to 1260kW and DC capacity coverage from 241kWh to 2.892MWh
Battery configuration: Utilizes HV 64V 314Ah LiFePO4 batteries, ensuring safety, reliability, and long lifespan
System design: Air-cooled integrated unit, stable operation, and energy-efficient
This project not only helps local hotel reduce electricity costs and improve power supply reliability but also provides a replicable, successful model for industrial and commercial energy storage in Nigeria.


3. Customer Benefits From this project
By adopting the BOOSTESS solution, the hotel benefits in several measurable ways:
- Cost Savings: The integrated PV and storage solution enables the hotel to use stored solar energy during peak tariff hours and outages, reducing annual electricity costs by 30-50% compared to reliance on diesel generators and the grid.
- Reliability: Uninterrupted backup supply during frequent blackouts—Nigerian businesses face grid failure rates as high as 30-40% per month. The system ensures over 99.9% power availability.
- Environmental Impact: The transition away from diesel generators reduces annual CO2 emissions by up to 800 tons per hotel (assuming ~1MW diesel offset), aligning with global sustainability standards and improving air quality.
- Operational Efficiency: Downtime events are reduced to nearly zero, protecting both guest experience and equipment.
4. Market Demand and Potential in Africa: Why C&I Storage is Essential in Nigeria
The African commercial and industrial (C&I) energy storage market is experiencing explosive growth, projected to expand at an annual rate of over 29% through 2030. In Nigeria specifically:
- Nigeria is expected to add over 1.6 GW of solar capacity in 2024 alone, creating strong pull-through demand for battery storage to handle variability and ensure grid stability.
- The end of fossil fuel subsidies and government incentives for solar + storage make renewable integration financially attractive.
- Nigeria’s grid is notoriously unreliable, with over 60% of firms relying on private generation. Battery storage provides a path to both energy independence and cost savings.
- The overall installed capacity for battery energy storage in Africa has skyrocketed from just 31 MWh in 2017 to 1,600 MWh in 2024, with a continent-wide project pipeline that exceeds 18 GWh.
Given Nigeria’s rapidly growing economy, large population, and acute energy security challenges, commercial energy storage is not just an upgrade—it is becoming an essential infrastructure investment for every forward-looking business. The BOOSTESS hotel project stands as a model for economic, operational, and environmental transformation in Africa’s commercial sector.

What Our Customer Talk About our BESS Project
ESS PRODUCTS RECOMMENDATION

Air-Cooling Energy Cube 105kW/241kWh
PV + Storage Hybrid Systems,Industrial Power Backup | LFP Battery 314Ah

Air-Cooling Battery Module 20.098kWh
CTP Design | Air-Cooled C&I Module | 8000 times Long lifespan