Nigeria All-In-One Hybrid ESS | Diesel Replacement | 50kW/100kWh
- Project capacity
- 50kW/100kWh
- Application
- Energy storage project
- Location
Nigeria
Project gallery
1 / 2Project
50 kW / 100kWh
Application
PV Diesel Genset, Critical Backup
Address
Port Harcourt, Nigeria
Project Background
In Port Harcourt, grid reliability can be challenging, with short outages and voltage fluctuations occurring during peak demand and severe weather, directly affecting front desk operations, lighting, air‑conditioning and guest comfort.
To maintain service, this 20‑room boutique hotel previously relied mainly on a diesel generator as backup power, resulting in high fuel consumption, noticeable noise, exhaust emissions and higher maintenance costs, all of which conflicted with the hotel’s vision of a quiet and eco‑friendly guest environment.
With the deployment of a 50 kW / 100 kWh BOOSTESS all‑in‑one energy storage system, PV, grid power and the existing diesel generator now operate in a coordinated way: during the day, rooftop PV supplies the load and charges the batteries; when the grid is stable, BOOSTESS performs smart charging/discharging and peak‑shaving; when the grid fails, the system switches to battery power within milliseconds and only starts the diesel generator when outages are prolonged or battery state‑of‑charge is low.

Battery System Highlights:
- Rated power: 50 kW, three‑phase AC
- Rated energy: 100 kWh (usable energy typically 90–95 kWh with 90% DoD setting)
- Battery type: Air Cooled LiFePO₄ (LFP) 314Ah 20.096kWh, cycle life ≥ 6000 cycles @ 80% DoD
- DC system voltage: approx. 700–800 V DC (high‑voltage battery stack)
- AC voltage: 400 V AC, three‑phase, 50 Hz
- Efficiency: PCS peak efficiency ≥ 97%, round‑trip system efficiency ≥ 90%
- Ingress protection: IP54–IP55, suitable for outdoor cabinet installation
PV Side Configuration
- PV capacity: 80kWp (about 160% DC oversizing relative to 50 kW AC)
- MPPT inputs: 4MPPTs, typically 2 strings per MPPT, max PV input voltage around 1000 V DC
- Typical daily PV generation (Port Harcourt, good solar resource):
Hotel Loads & Backup Capability (20 Rooms)
- Estimated critical load:
- Estimated backup duration from 100 kWh battery (ideal, full charge, not including safety reserve):
- At 30 kW critical load: ≈ 3+ hours
- At 20 kW critical load: ≈ 4.5–5 hours
- Night‑time with reduced AC (≈ 15 kW): up to ≈ 6+ hours
Diesel Genset & Operating Strategy
- Diesel generator rating: 50kVA (≈ 40 kW), compatible with 50 kW PCS parallel operation
- Typical strategy:
- Short outages: battery‑only operation, no genset.
- Long outages: start genset when SOC falls to ~30–40%, power both loads and battery charging.
- Grid return: stop genset, resume normal grid + PV + battery operation.

BOOSTESS Solution Value
- Hybrid & right‑sized for Nigeria
PV + grid + diesel generator + battery in one system, engineered for Nigeria’s unstable grid and high solar resource, and sized precisely for a 20‑room hotel with future expansion headroom. - High efficiency & PV oversizing
Multiple MPPTs and up to roughly 150–200% DC‑side PV oversizing help maximize use of limited roof or carport area and harvest more Port Harcourt sunlight. - Millisecond transfer, better guest experience
High‑speed static transfer switches to battery in milliseconds during grid failures or severe voltage dips, keeping POS, PMS, e‑locks and Wi‑Fi online without reboot. - Robust safety design
High‑safety batteries plus multi‑level BMS, temperature/smoke sensing and electrical protection help the hotel meet building and fire‑safety requirements while lowering operational risk. - Pre‑integrated cabinet with smart O&M
The 50 kW / 100 kWh cabinet is factory‑integrated and tested for quick “drop‑in & connect” installation, while the EMS enables remote monitoring, data analytics and AI‑assisted diagnostics to ease the O&M workload.