Kenya Tea Factory PV + Diesel Replacement | 261kWh
- Project capacity
- 261kWh
- Application
- Industrial storage
- Location
Kenya
Project gallery
1 / 4Project illustration. See the project description for the documented configuration.
Project Title:
Solar Hybrid System for Tea Processing
Application:
PV + Diesel Replacement
Location:
Kericho, Kenya
Project Background & Challenges:
Kericho, located in Kenya’s renowned tea-producing region, is home to a large tea processing facility. The plant relies heavily on diesel generators to power its energy-intensive withering and drying machines, crucial steps in tea production. However, the high cost and environmental impact of diesel consumption — averaging 1,200 liters per month — posed a significant challenge. With fluctuating fuel prices and a growing commitment to sustainability, the facility sought a solution to reduce its reliance on fossil fuels while maintaining consistent energy supply and optimizing operational costs.
Solution & Value Delivered:
To address these challenges, the plant implemented a hybrid energy system consisting of an Energy Cube (125kW/261kWh) and a 300kW solar PV array. The solar system now powers the withering and drying machines during the day, while the Energy Cube stores excess solar energy for use during periods of high demand or low sunlight. As a result, diesel consumption was reduced by a remarkable 83%, dropping from 1,200 liters to just 200 liters per month. This not only led to significant fuel cost savings but also reduced the facility’s carbon footprint, contributing to both financial and environmental sustainability. Furthermore, the integration of solar energy enhanced the plant’s energy security by providing a reliable, renewable power source, ensuring uninterrupted tea production and reinforcing the company’s commitment to green energy solutions.