PROJECT CASE · COMMERCIAL & INDUSTRIAL

Heavy Steel Pipe Factory Storage | 700kW / 1.5MWh

Project capacity
700kW / 1.5MWh
Application
Peak shaving and backup power
Location
China flagHangzhou, Zhejiang, China

Project overview

Location: Hangzhou, Zhejiang, China

Source-listed system capacity: 700kW / 1.5MWh

Application: Peak shaving and backup power

Project reference

This reference is documented in the supplied BOOSTESS company brochure. The source project photograph is displayed with this reference.

← Back to case study
Share this projectLinkedIn ↗
Need Help?
Scroll to Top