PROJECT CASE · COMMERCIAL & INDUSTRIAL
Heavy Steel Pipe Factory Storage | 700kW / 1.5MWh
- Project capacity
- 700kW / 1.5MWh
- Application
- Peak shaving and backup power
- Location
Hangzhou, Zhejiang, China
Project gallery
1 / 1Project overview
Location: Hangzhou, Zhejiang, China
Source-listed system capacity: 700kW / 1.5MWh
Application: Peak shaving and backup power
Project reference
This reference is documented in the supplied BOOSTESS company brochure. The source project photograph is displayed with this reference.
← Back to case study
Share this projectLinkedIn ↗


