PROJECT CASE · COMMERCIAL & INDUSTRIAL

Gabon Timber Factory Off-Grid Microgrid | 1.25MW / 3.7MWh

Project capacity
1.25MW / 3.7MWh
Application
Off-grid timber processing; solar and storage
Location
Gabon flagGabon

Project overview

This off-grid project serves a timber processing factory in Gabon. The configured energy storage system is rated at 1.25MW / 3.7MWh and is paired with 1.7MW of photovoltaic generation.

The project is intended to replace diesel-based power supply with a coordinated solar and battery system. Dispatch, reserve energy and load priority depend on the final site operating requirements.

← Back to case study
Share this projectLinkedIn ↗
Need Help?
Scroll to Top