PROJECT CASE · COMMERCIAL & INDUSTRIAL
Gabon Timber Factory Off-Grid Microgrid | 1.25MW / 3.7MWh
- Project capacity
- 1.25MW / 3.7MWh
- Application
- Off-grid timber processing; solar and storage
- Location
Gabon
Project gallery
1 / 3Project overview
This off-grid project serves a timber processing factory in Gabon. The configured energy storage system is rated at 1.25MW / 3.7MWh and is paired with 1.7MW of photovoltaic generation.
The project is intended to replace diesel-based power supply with a coordinated solar and battery system. Dispatch, reserve energy and load priority depend on the final site operating requirements.
← Back to case study
Share this projectLinkedIn ↗


