Czech Historic Castle Hotel | Microgrid 105/241 kWh
- Project capacity
- 241 kWh
- Application
- Backup power
- Location
Czech Republic
Project gallery
1 / 3Project illustration. See the project description for the documented configuration.
Project Title:
Heritage-Sensitive Energy Resilience
Capacity:
241 kWh (Energy Cube 105kW/241kWh) + 150 kW BIPV
Location:
Český Krumlov, Czech Republic (UNESCO World Heritage Site)
1. Market Context & Customer Requirements
Český Krumlov is a UNESCO World Heritage town with strict preservation rules that restrict visible rooftop solar and any changes to the historic skyline.
The castle hotel faces aging local grid infrastructure, voltage instability, and occasional outages that threaten heating, lighting, kitchens, and guest comfort during peak tourist seasons.
The owner needed a heritage‑sensitive solution that would:
- Secure reliable power for critical hotel services without altering the building’s protected appearance.
- Reduce electricity bills and diesel backup usage through onsite renewable generation and storage.
- Demonstrate leadership in sustainable tourism within a UNESCO‑listed destination.
2. Solution Design & Key Technical Data
System Capacity: 105 kW / 241 kWh Energy Cube microgrid, integrated with 150 kW Building‑Integrated Photovoltaics (BIPV) that visually blend into the castle’s architecture.
Application Mode: PV‑plus‑storage microgrid that prioritizes solar self‑consumption, supports peak‑shaving, and provides seamless backup power during grid disturbances.
Operating Strategy:
- Daytime: BIPV supplies hotel loads (HVAC, lighting, kitchens, conference rooms), with surplus energy charging the 241 kWh storage system.
- Grid Events: When voltage dips or outages occur, the Energy Cube instantly supports critical circuits to keep operations running and guests comfortable.
Scalability & Integration:
- The 105 kW / 241 kWh architecture allows future expansion by adding more storage cabinets or additional BIPV surfaces on canopies and courtyard facades, without compromising heritage rules.

2.1 System Configuration Details Overview
BIPV Array Power
- BIPV installed capacity: 150 kW, designed into glass canopies, façade elements, and other discreet surfaces that meet conservation guidelines while generating clean power onsite.
Energy Storage & Power Conversion
- Energy Cube capacity: 105 kW / 241 kWh high‑voltage LFP energy storage system, configured as modular battery racks managed by an advanced BMS and EMS.
- Operating Mode: Supports grid‑tied, peak‑shaving, and backup operation, with automatic transfer to island mode during grid failures to protect critical hotel loads.
2.2Typical PV + Storage System Specifications (Castle Hotel)
System Overview
- Application: Heritage‑sensitive microgrid for a historic castle hotel (Český Krumlov, Czech Republic).
- Function: BIPV‑plus‑storage microgrid providing PV self‑consumption, peak‑shaving, and backup for critical hotel loads.
PV / BIPV Subsystem
- BIPV installed capacity: 150 kW, realized with façade, canopy, and glass‑integrated PV modules that comply with heritage and architectural requirements.
- PV inverters:
- Model: Solis S5‑GC(50‑60)K three‑phase string inverters, 3 units
- MPPT configuration:
- Max efficiency: up to 98.7%; string current up to 16 A; AFCI DC arc‑fault protection; IP66 for outdoor use.
Energy Storage Subsystem
- PCS (Power Conversion System):
- Model: EPCS105‑AM bidirectional PCS module.
- Rated power: 105 kW; max power: 116 kW.
- DC side:
- AC side:
- Efficiency: max conversion efficiency ≥ 98.5%; 110% continuous overload capability.
- Battery bank:
- Total capacity: 241 kWh high‑voltage LiFePO₄ battery system (configured as multiple strings with BMSER BMUs).
- Voltage window: matched to EPCS105‑AM’s 615–950 V (or 650–950 V) DC range, designed as series/parallel racks with LFP cells.
- BMU / BMS (battery management):
- Supplier: BMSER; max 24‑string voltage sampling and up to 28 temperature sampling points per BMU (variant‑dependent).
- Up to 16 BMUs can be connected via isoSPI; communication via RS‑485 and isoSPI; supports active balancing (up to 2.5 A) and passive balancing.
- Electrical isolation and high‑voltage design up to 1500 V, UL94‑V0 compliant materials.
- EMS (Energy Management System):
AC Distribution and Grid Interface
- AC busbar / MDB: 400 V three‑phase main distribution board at the point of common coupling (PCC) for PV inverters, PCS, grid incomer, and hotel loads.
- Grid connection: 400 V LV side of utility transformer, with grid incomer breaker and revenue metering as required by the DSO.
- Operating modes:
- Grid‑tied: PV and PCS operate to maximize self‑consumption and reduce peak demand.
- Backup / microgrid: PCS forms the local grid during outages to support prioritized critical circuits (HVAC, emergency lighting, IT, essential services).
3. Electrical Design & Heritage‑Friendly Integration
The microgrid is engineered to meet modern electrical safety and grid‑code requirements, while respecting strict heritage constraints inside the historic town center.
All visible elements, including BIPV and outdoor cabinets, are carefully placed or architecturally integrated to avoid visual impact on the castle’s protected façade.
Key design aspects:
- BIPV strings feed into DC combiner boxes and inverters located in technical areas hidden from public view.
- The Energy Cube connects to the hotel’s main distribution board, where it performs peak‑shaving and provides backup power to prioritized circuits (HVAC, emergency lighting, IT, and guest services).
- Protection devices (DC/AC SPDs, breakers, isolators, and monitoring relays) are installed in existing or new technical rooms, without altering historic interior features.

4.Electrical Components BOM CHECKLIST – 150 kW BIPV + 105 kW / 241 kWh Microgrid
4.1 BIPV / PV Side Components
| No. | Component | Specification / Description | Qty |
|---|---|---|---|
| 1 | BIPV modules | Building‑Integrated PV modules totaling 150 kW (façade, canopy, glass, etc.), certified for building envelope and heritage‑compliant installation. | As per 150 kW design |
| 2 | BIPV mounting / façade system | Custom façade and canopy support structures, brackets, profiles, and fixing hardware for BIPV integration. | 1 set |
| 3 | String DC combiner boxes | 1000–1100 V DC combiner boxes with string fuses, Type II DC SPDs, DC isolators, and PE bar. | 1–3 pcs |
| 4 | PV string fuses | DC fuses per BIPV string, rated for string short‑circuit current and 1000–1100 V DC. | 1 set |
| 5 | DC SPDs (PV) | Type II DC SPDs on combiner input/output for BIPV arrays. | 1 set |
| 6 | DC isolators (PV) | DC switches near combiner and inverters, 1000–1100 V DC rated. | 1–3 pcs |
| 7 | PV DC cables (strings) | Double‑insulated, UV‑resistant PV cables (e.g. 4–6 mm²), 1000–1100 V DC. | As per layout |
| 8 | PV DC cables (combiner → inverters) | DC cabling sized for combined current and distance, 1000–1100 V DC. | As per layout |
| 9 | PV inverters | Solis S5‑GC(50‑60)K three‑phase string inverters, 50–60 kW each, 5/6 MPPTs, 180–1000 V MPPT range, 1100 V max DC. | 3 pcs |
| 10 | PV inverter AC breakers | 3‑/4‑pole MCCBs for each S5‑GC(50‑60)K output, sized for 50–60 kW at 400 V (~80–100 A). | 3 pcs |
4.2 PCS, Battery, BMS, EMS
| No. | Component | Specification / Description | Qty |
|---|---|---|---|
| 11 | PCS – EPCS105‑AM | 105 kW bidirectional energy storage PCS, DC 615–950/650–950 V, AC 230/400 V, max efficiency ≥ 98.5%, PF 1 lead to 1 lag. | 1 pc |
| 12 | PCS AC breaker | 3‑/4‑pole MCCB for PCS AC connection to MDB, sized for 105 kW at 400 V (approx. 167 A nominal, consider 200 A frame). | 1 pc |
| 13 | PCS DC disconnect | HV DC disconnect switch/MCCB between battery bus and PCS DC input, rated for PCS max DC current and 1000 V DC. | 1 pc |
| 14 | Battery racks / cabinets | LiFePO₄ battery racks totaling 241 kWh, configured to match 615–950 V system voltage, 0.5 C–class charge/discharge capability. | As per 241 kWh design |
| 15 | Battery DC cables | HV DC cables from battery racks to PCS, sized for up to 170 A and route length. | As per layout |
| 16 | BMU / BMS modules | BMSER BMU modules, up to 24‑string voltage and 28‑point temperature sampling, isoSPI networking, RS‑485, active/passive balancing. | As per battery string count |
| 17 | BMS master controller | BMSER master/controller or equivalent for aggregating multiple BMUs, providing CAN/RS‑485 to PCS and EMS. | 1 set |
| 18 | EMS controller | LNXALL or equivalent EMS platform for energy scheduling (PV/PCS/grid/load), SOC control, modes (self‑use, peak‑shaving, backup). | 1 set |
| 19 | EMS communication | Industrial PC or embedded controller with Ethernet/RS‑485/CAN ports, running EMS software. | 1 pc |
| 20 | Communication cables | Shielded RS‑485, CAN, and Ethernet cables connecting PCS, PV inverters, BMS, meters, and EMS. | As per layout |
4.3.AC Distribution and Grid Connection
| No. | Component | Specification / Description | Qty |
|---|---|---|---|
| 21 | Main distribution board (MDB) | 400 V three‑phase LV switchboard at PCC with busbars, incomer, PV and PCS feeders, load feeders, metering section. | 1 pc |
| 22 | Grid incomer MCCB | Main breaker from transformer LV to MDB, sized for total hotel load and microgrid contribution. | 1 pc |
| 23 | Feeder breakers – PV | MCCBs for each Solis S5‑GC(50‑60)K feeder from MDB. | 3 pcs |
| 24 | Feeder breaker – PCS | MCCB for EPCS105‑AM feeder from MDB (see No. 12). | 1 pc |
| 25 | Critical load feeder breakers | MCCBs/MCBs feeding critical load distribution board (HVAC essential, emergency lighting, IT, life safety). | As per circuits |
| 26 | General load feeder breakers | MCCBs/MCBs feeding general hotel loads (rooms, non‑critical services). | As per circuits |
| 27 | Critical load DB | Sub‑distribution board for prioritized/backup‑supplied loads. | 1 pc |
| 28 | General load DBs | Existing or new DBs for other hotel loads. | As required |
| 29 | AC cables (MDB ↔ equipment) | 3‑phase + N + PE cables between MDB and PV inverters, PCS, loads, sized for current and distance. | As per layout |
4. Typical Use Scenarios & Verified Results
- Normal Operation: BIPV covers a significant share of daytime electricity demand, reducing grid import and stabilizing power quality for sensitive hotel equipment.
- Peak Tariff Periods: The storage system discharges to shave peak demand, lowering demand charges and optimizing energy costs.
- Grid Disturbances & Outages:
5. Safety, Stability & Replicability
The microgrid adopts industrial‑grade safety design with multi‑layer protections at the battery, inverter, and system levels.
Remote monitoring, alarms, and EMS‑based control ensure stable long‑term operation with minimal manual intervention.
Replicability:
- The modular 105 kW / 241 kWh architecture and BIPV approach can be replicated in other heritage hotels, museums, and historic public buildings where conventional PV is restricted.
- Reliable, uninterrupted power helps operators protect both guests and sensitive heritage assets, even under adverse grid conditions.
6. Market Trends & Strategic Value
Heritage tourism destinations across Europe are under pressure to decarbonize while preserving historic architecture, making BIPV‑plus‑storage a strategic pathway for sustainable upgrades.
This Czech castle hotel project deliverd by BOOSTESS team demonstrates how modern microgrids can deliver energy resilience, cost savings, and emissions reductions—without compromising UNESCO conservation standards—setting a benchmark for sustainable heritage hospitality.
Products Recommeded for you

Air-Cooled Energy Storage Cabinet 241kWh
C&I BESS | FLEXIBLE SCALABILITY | LPF Battery

Solis Three Phase Hybrid Inverter S5-GC(50-60)K
5/6 MPPT, max. efficiency 98.7% | AFCI protection | IP66, C5 Anti-Corrosion level

BMSER 24 Strings (BMU)
- Max 24-str voltage sampling
- Max 28-str temperature sampling
- Max 16pcs BMU can be connected via isoSPI