Argentinian Vineyard Irrigation PV + ESS Project | 50kW/100 kWh * 4 Units
- Project capacity
- 400kWh total · 4 × 100kWh cabinet
- Application
- Agriculture & microgrid
- Location
Mendoza, Argentina
Project gallery
1 / 5Project illustration. See the project description for the documented configuration.
Date:
2023-06-16
Project Title:
Solar-Powered Irrigation for Mendoza Vineyard
Capacity:
400 kWh
Application:
PV Solar Storage + Pump Power
Location:
Mendoza, Argentina
1. Market Context & Customer Requirements
Argentina’s Mendoza wine region is dry and increasingly exposed to longer droughts and higher electricity prices, while irrigation is absolutely critical to maintain grape yield and wine quality.
The vineyard previously relied heavily on the local grid for pumping, facing high daytime tariffs and occasional power shortages during peak agricultural seasons, which threatened production stability and profit margins.
The owner wanted a solution that could secure reliable irrigation, cut grid dependence and energy bills, and enhance the winery’s sustainability image for export markets.
2. Solution Design & Key Technical Data
System Capacity: 50 kW / 100 kWh Energy Cube, paired with a 60 kW PV array, sized around the vineyard’s irrigation load and daytime solar resource in Mendoza.
Application Mode: PV priority to directly drive irrigation pumps in the day, with surplus energy stored in batteries for evening or night-time irrigation periods.
Operating Strategy: Solar-storage microgrid for “PV Self-consumption + Pump Power”, supporting automatic switching between PV, battery, and grid to ensure continuous water supply.
Scalability & Integration: The system is compatible with further PV expansion or additional storage cabinets to cover more land or future electrified farm loads.
2.1.System Configuration Details Overview:
PV Array Power
PV installed capacity: 60 kWp, designed according to local solar resources and irrigation load to support daytime irrigation and battery charging.
Hybrid Inverter Power
- Three-phase hybrid inverter rated power: 50 kW, enabling “PV directly driving the irrigation pumps + battery charging/discharging + grid interaction”.
MPPT & PV Input
- Maximum PV input power: approximately 96 kW, with reserved margin for future PV expansion.
- MPPT operating voltage range: 150–850 V, matching the local PV string design.
- Maximum input current: 40 A × 4 MPPT trackers.
Battery Side Capacity & Topology
- Single cabinet battery capacity: 100 kWh LFP energy storage system.
- Project configuration: 4 units of 100 kWh battery cabinets in parallel, providing a total usable capacity of about 400 kWh, enabling longer irrigation hours and reliable night-time operation with a combined 50 kW × 4 cabinet topology if expanded.
- Battery system operating voltage range: approximately 280–408.8 V per cabinet, with multiple cabinets paralleled on the high-voltage side and integrated into the grid via the hybrid inverter.
Battery Pack Configuration
- Single battery pack capacity: 314 Ah LiFePO₄ cells, with about 20.096 kWh energy per pack.
- Cell chemistry: LiFePO₄, offering high safety and long cycle life, well-suited for high-temperature and high-frequency charge/discharge agricultural scenarios.
- Multiple 20.096 kWh battery packs are connected in series and parallel to form a 100 kWh high-voltage battery cluster in each cabinet, which is centrally managed and protected by the BMS.
PV + Storage System Specifications
| Item | Parameter | Value / Description |
|---|---|---|
| PV Array Power | PV installed capacity | 60 kWp, sized according to local solar resource and irrigation load to support daytime irrigation and battery charging. |
| Hybrid Inverter Power | Rated power | 50 kW three‑phase hybrid inverter, enabling “PV direct‑driving pumps + battery charge/discharge + grid interaction”. |
| MPPT & PV Input | Max PV input power | ≈ 96 kW, with reserved margin for future PV expansion. |
| MPPT operating voltage range | 150–850 V, matching local PV string design. | |
| Max input current | 40 A × 4 MPPT trackers. | |
| Battery Side Capacity & Topology | Single cabinet capacity | 100 kWh LFP (LiFePO₄) energy storage system per cabinet. |
| Project configuration | 4 × 100 kWh cabinets in parallel, total usable capacity ≈ 400 kWh, supporting extended irrigation and night‑time operation. | |
| Battery system voltage range | ≈ 280–408.8 V per cabinet; multiple cabinets paralleled and combined on the high‑voltage side for grid connection. | |
| Battery Pack Configuration | Single battery pack capacity | 314 Ah LiFePO₄ cells, about 20.096 kWh per pack. |
| Cell chemistry | LiFePO₄, high safety and long cycle life, suitable for high‑temperature, high‑frequency charge/discharge agricultural scenarios. | |
| Pack topology | Multiple 20.096 kWh packs connected in series/parallel to form a 100 kWh high‑voltage battery cluster in each cabinet, managed and protected by BMS. |
How Is the PV Hybrid Storage System is electrically Designed
Typical Grid‑Connected PV Side Wiring Topology (Text‑Based Single‑Line Diagram)
The main power path from source to load can be abstracted as follows:
- PV module strings (PV Strings)
→ DC combiner box / DC isolator (DC Combiner / DC Isolator)
→ Hybrid inverter PV input (Hybrid Inverter – PV Input, multi‑MPPT)
→ AC breaker at inverter output (AC Breaker at Inverter Output)
→ AC busbar / distribution board at grid connection point (AC Busbar / Distribution Board)
→- One branch to the irrigation pump load (Irrigation Pump MCC / Load Breaker)
- One branch to the grid side (Grid Connection / LV side of Utility Transformer)
At the same time, the hybrid inverter is connected to the battery energy storage cabinets through a dedicated DC interface for battery charging, discharging, and backup power supply.

Key Components (Solis S6‑EH3P50K‑H Based System)
- PV Side Components
- PV module strings (same module type, series‑connected; grouped by orientation/tilt).
- DC combiner box with:
- DC cabling from strings to combiner, and from combiner to inverter PV inputs, rated for up to 1000 V and current per design.
- Solis S6‑EH3P50K‑H hybrid inverter PV input stage:
- Battery Energy Storage Components
- BOOSTESS Four 100 kWh high‑voltage LFP battery cabinets (total 400 kWh), each with internal BMS, fuses and contactors.
- Two HV battery inputs on S6‑EH3P50K‑H (Battery Port 1 & Battery Port 2):
- DC battery cables from each cabinet (or cabinet pair) to the inverter battery ports, including external battery DC disconnects/breakers where required.
- AC Side and Grid Connection Components
- Solis S6‑EH3P50K‑H AC grid port (3/N/PE, 220/380 V or 230/400 V) and backup port (optional use for critical loads).
- AC output breaker (3‑ or 4‑pole MCCB) on the grid port, sized for approx. 76 A nominal at 50 kW.
- Main AC distribution board / AC busbar at the point of common coupling (PCC).
- Grid incomer breaker (from LV side of utility transformer/site main board).
- Outgoing feeder breaker to irrigation pump MCC or VFD panel.
- Revenue/energy meter and CTs as required by the utility and for inverter export‑limit/self‑use control.
- Control, Monitoring and Protection
- Solis monitoring interface (LCD + communication: RS‑485, CAN, Ethernet; optional Wi‑Fi/4G/LAN).
- CTs or meter wired to the “Smart Port” / communication terminals for measuring grid import/export.
- DC and AC surge protection devices; overcurrent and short‑circuit protection; anti‑islanding and grid‑code compliant protections integrated in the inverter and external relays where needed.
Wiring Instructions with Solis S6‑EH3P50K‑H
1. PV DC Wiring to S6‑EH3P50K‑H
- String and combiner connection
- Connect each PV string (positive/negative) to the DC combiner box, passing through string fuses; connect DC SPDs between PV bus and PE.
- Ensure open‑circuit voltage of each string is below 1000 V and within the MPPT operating range (150–850 V), with temperature margins.
- Combiner to inverter PV inputs
- From the combiner box output, route DC cables to the PV input terminals of the S6‑EH3P50K‑H.
- Distribute strings across the 4 MPPTs (up to 8 strings total) according to orientation and current limitations; do not exceed 40 A per MPPT input or 96 kW total PV power.
- Use the integrated DC switch on the inverter for isolation; add external DC isolators if required by local code.
2. Battery DC Wiring (4×100 kWh Cabinets)
- Assignment of cabinets to battery ports
- Connect two 100 kWh cabinets in parallel to Battery Port 1 and the other two cabinets in parallel to Battery Port 2, forming two HV battery groups with balanced capacity and current.
- Use a DC combiner/terminal block per port if needed, with equal cable lengths and cross‑sections from each cabinet to the combiner to ensure current sharing.
- Connection to inverter battery terminals
- From each group combiner, run positive and negative HV DC cables to the corresponding battery terminals of the S6‑EH3P50K‑H, observing correct polarity and torque as per the manual.
- Install DC disconnect switches or breakers in each cabinet’s output and/or in the combined lines for safe isolation and maintenance.
- BMS communication
- Daisy‑chain the CAN/RS‑485 communication cables from each battery cabinet to the inverter’s battery communication ports according to the battery and Solis wiring diagrams.
- Set the correct battery protocol and parameters in the inverter (battery brand/model or “custom”), including charge/discharge current limits, SOC window and protection thresholds.
3. AC Wiring: Grid Port, Backup Port and Loads
- Grid port (main AC connection)
- Remove the S6‑EH3P50K‑H AC wiring box cover; run 3‑phase (L1, L2, L3), neutral and PE cables through the AC port to the grid terminal block.
- Connect L1, L2, L3, N and PE to the corresponding terminals, then from the inverter AC breaker to the AC busbar/PCC in the main distribution board.
- Select cable size and breaker rating according to 50 kW output (approx. 72–76 A nominal), local standards, and cable length.
- Backup port (optional critical‑load output)
- If using the backup port, connect L1, L2, L3, N and PE from the backup terminal to a dedicated backup load board, and place all critical loads (if any) on that board.
- The backup port can provide up to 1.6× rated power for short durations; ensure downstream breakers and cables are sized accordingly.
- Irrigation pump and grid incomer
- From the AC busbar, connect the irrigation pump MCC/VFD through its own feeder breaker and motor protection devices.
- Connect the grid incomer (utility transformer LV or site main board) to the same busbar via a main breaker and any required utility protection relay.
4. CTs, Meter and Smart Port Wiring
- Install three CTs (or a 3‑phase meter) on the grid incomer or at the PCC, as specified by Solis, to measure import/export power.
- Wire CT outputs to the Smart Port / communication terminal block of the S6‑EH3P50K‑H following the terminal numbering in the installation manual (CT1/CT2/CT3 to the correct ports, observe polarity and direction).
- Configure the inverter for “self‑use”, “backup” or “peak‑shaving” mode and, if required, grid export limit according to project requirements and utility rules.
3. Economic & Environmental Impact
By using solar energy as the primary source, the vineyard reduced grid electricity dependence by about 90%, significantly lowering exposure to volatile tariffs and grid outages.
Optimized water-pump operation through the solar-storage system reduced overall water-related operating costs by around 25%, while cutting the vineyard’s carbon footprint and diesel/emission-related environmental impact.
This clean-energy upgrade supports the winery’s sustainability positioning, which is increasingly valued in global wine markets that focus on low-carbon and responsible water management.
4. Typical Use Scenarios & Verified Results
Daytime: PV directly powers the irrigation pumps; when solar generation exceeds pump demand, the surplus charges the 100 kWh battery system.
Evening & Night: The Energy Cube discharges to support scheduled irrigation, ensuring stable water delivery even when the grid is weak or expensive.
Seasonal Operation: During critical growing stages, the system guarantees reliable irrigation to protect grape quality and yield, reducing the risk of water stress in prolonged dry spells.
5. Safety, Stability & Replicability
The integrated BESS adopts standard industrial safety design with multi-level protections (battery management, inverter protection, and remote monitoring/alarms) to maintain stable long-term operation.
The modular 50 kW / 100 kWh architecture can be quickly replicated for other vineyards, orchards, and remote farms that need irrigation and off-grid/weak-grid support.
Reliable, uninterrupted pump power helps farmers maintain production even under grid fluctuations, making it a robust model for agricultural regions with similar climate and grid conditions.
6. Market Trends & Strategic Value
Global vineyards, especially in arid regions like Mendoza, are rapidly adopting drip irrigation and precision water management, which makes stable, low-cost electricity for pumping increasingly important.
Solar-plus-storage irrigation is emerging as a key solution for agricultural decarbonization, reducing operating costs while supporting sustainable water and energy practices demanded by international wine buyers.
This Argentinian vineyard project serves as a practical, data-backed reference for wineries and farms seeking to combine irrigation security, cost control, and a stronger green brand image.




Air Cooled Energy Storage Cabinet 50kW/100kWh
PV STORAGE | ALL-IN-ONE DESIGN | Agriculktural backup

Air Cooled C&I Battery Module 20.096kWh
CTP DESIGN | COMPACT SIZE | 1P20S LFP Battery Cell

Solis Three Phase Hybrid Inverter S6-EH3P(29.9-50)K-H
3/4 MPPT | Commercial and Industrial Use | AC-DC High Energy Efficiency